Renovation quotes rarely include the full stack
Headline quotes cover cabinets and paint, not always admin packages, haul-away, or electrical tweaks once inspectors visit. Layer typical UAE add-ons before you sign a contractor LOI. Your contractor quote field should be **excluding VAT**; the total shown here is still **pre-VAT**. Add **5% UAE VAT** on taxable supplies separately.
Planning figures reviewed · Q2 2026
What each fee means
Building NOC, admin & access coordination
Many towers charge admin fees and require NOC packages before work starts; planners often under-budget this block. Premium towers charge more than older stock.
Estimate · Set by each building's owners association or developer. No central tariff — treat as a planning band. · checked 2026-07-31
DEWA / MEP change allowance (estimate)
Small power, HVAC, or meter adjustments can balloon once walls open. Modelled as a percentage of your headline quote rather than a fixed fee, because it scales with scope.
Estimate · Contingency allowance chosen by HiddenFees, not a published charge. Scope-dependent. · checked 2026-07-31
Haul-away, protection & site logistics
Waste tickets, floor protection, and after-hours uplift slots rarely sit inside the fit-out lump sum.
Estimate · Contractor and building logistics pricing. Varies by tower rules and project size. · checked 2026-07-31
Drawing review & permit buffer
Municipality or consultant revisions add processing lines separate from your contractor invoice.
Estimate · Consultant and permit processing pricing. Depends on drawing complexity and revision rounds. · checked 2026-07-31
Sponsored placement
Recommended services
Tools people usually need right after this step.
Dubai Permits Desk
Track NOC, municipality submissions, and consultant sign-offs so your fit-out schedule does not slip silently.
Fit-out Insurance
Short-term site coverage while contractors work. Useful when master community rules require proof.
Licensed Haul-away
Book permitted waste removal with DMC tickets included, avoiding ad-hoc elevator fines.
Common questions
- Why is renovation more expensive than the contractor number?
- Because landlords, master developers, and utilities bill parallel steps: NOCs, deposits, and change orders stack beside the fit-out scope itself.
- Does every building charge the same NOC fees?
- No. Premium towers can charge higher admin packages, while older stock may be looser. Treat this block as a planning band, not a single fixed receipt.
- Should I include VAT separately?
- Yes. This calculator models common pre-VAT add-ons. Budget 5% UAE VAT on taxable supplies in addition to your net scope.